Pilot sites
We run pilots for six to nine months at sites with a plant room and a steady heat load. Three are live, and two more are being sited for spring.
| Site | Type | Store | Status |
|---|---|---|---|
| Ostwick Primary School | School kitchen and hall | 40 kWh | Live since March |
| Slatter Street Offices | Office, 120 desks | 2 × 40 kWh | Live since January |
| Tarnby Dairy | Process hot water at 70 °C | 40 kWh | Live since June |
Who we can pilot with
We are looking for a plant room, a three-phase supply and a named person who can sign off the site.
Peak heat load
At least 150 kW peak, most of it in one or two hours a day.
Plant room
Space for a 1.2 × 0.8 m unit and clear access for a delivery lorry.
Monitoring
Access to the building meter so we can share the results with you and publish them.
Request a pilot
Tell us about the site. A named engineer replies within five working days to arrange a survey.
We wanted the data before we committed, and the monitoring gave us that.
Email pilots@example.com with the site details, or call 01632 960 802.